Understanding the Process
All items must be removed from the floor. Items may be left hanging on walls.
We diamond grind the entire floor to remove the smooth cream from the concrete to promote adhesion.
Polyurea repair material is used to fill voids and cracks prior to application of the coating.
Base coat and color flakes are installed and left to cure. Scraping of the color flakes and a good vacuum is necessary for a uniform finish. The polyaspartic top coat is then applied and rolled to a uniform finish
4 to 6 hours is required before foot traffic and 24 to 48 hours is required prior to vehicle traffic and heavy items.